City Tunnel No. 3 has been under construction since 1970 (for more information see my other post about the tunnel). Each shaft has a ventilation tower. Originally, the sidewalk entry door for each shaft, (some as deep as 1000 feet), was labelled with the shaft number. These were removed after 9/11/01. But they can still located by their distinctive ventilation towers. The towers are not identical, but have a consistent style. Once you've seen these you should be able to recognize others.
Shaft 14b, New York
Shaft 19b, Brooklyn
Shaft 16b, Queens
Shaft 23b, Brooklyn
Shaft 11b, New York
Shaft 20b, Brooklyn